An Experienced Industrial Engineer focused on Supply Chain and Analytics. Experience in working of E2E (End to End) Supply Chain, S&OP (Sales and Operations Planning), Data Analytics, and continuous improvement. Experienced in Inventory Forecasting, Process Improvement, and Optimization. Proficient in analyzing, extracting and visualizing data, and monitoring KPIs for enhanced decision-making.
Experience:
3.5 Years of Experience in India in the field of Project Management/Supply Chain and 6 months of Experience in Internal Logistics in Manufacturing Sector.
Interests:
Supply Chain | Logistics | S&OP | Strategic Planning | Demand Management | Warehouse Inventory Management | Process Improvement | Lean | Six Sigma | Quality Manufacturing | Project Management | Order Management | Data Analytics | Demand Planning | ERP | MRP | Operations | E-Commerce
Programming and Statistical Analysis: Excel, R, Minitab & Python
Database: MySQL & Access
Data Visualization: Tableau
Technical: Supply Chain Management/Analytics, Demand Planning & Forecasting, Supply Capacity, Planning, Capacity Planning, Material Planning, Strategic Planning, Distribution Planning, Logistics, Purchasing, Procurement, S&OP, Continuous Improvement, Inventory Planning/Optimization, Data Analysis, Transportation, Statistical Modeling, Data Analysis, MRP, MPS, Optimal Order Fill Rate Analysis, EOQ, Safety Stock Modelling & Multi-echelon Inventory Analysis
Statistical Methods: Regression, Hypothesis Testing, ANOVA, Confidence Intervals, Time Series.
Extract Transform load or ETL tool is power bi
Dax( Data analysis expression )evaluating language
-
Experience
WACKER NEUSON SE Milwaukee, WI-(June 2019- December 2019)
Logistic Engineer Intern, Internal Logistics
• Implemented warehouse module in SAP and finished 3% of 1000+ parts of the Large Parts warehouse
• Reduced inventory for 500+ parts on line storage by 5% by applying lean techniques
• Led warehouse strategy which reduced the pick-up parts time by 75%
• Developed efficient Tugger routes using Six sigma principles and minimized the material delivery time by 20% for 200+ parts
• Optimized and implemented warehouse layout for pallet racking to improve the racking space by 48%
• Executed material function of NPI project and designed a CAD layout for setting the necessary equipment and flow of modules
2015-2018 IASYS TECHNOLOGY SOLUTIONS PVT. LTD. Pune, India
Project Manager (January 2016 – June 2018)
• Managed 5+ project costs, scheduled projects, and communicated plans to appropriate stake holders
• Adapted between Cross Functional Work Teams (CFWT) ensuring the product development and safety, and delivering the product with 17% efficiency
• Completed project to reduce average manufacturing lead time from 54 days to 37 days by implementing Lean Principles and Kanban
• Initiated 6S in the organization by using methods of Team Based Work System (TBWS)
• Revamped the process flow of parts and augmented productivity by 15%
• Analyzed Kaizen methods to improve operations, reduce costs, and maximize productivity
• Acted as technical liaison between stake holders and the suppliers
Project Management Intern (May 2015-August 2015)
• Analyzed the Project scope, generated and ordered 500+ parts from the Bill of Materials (BOM)
• Managed inventory in the warehouse using VMI and ensured project wise allocation of material
• Interpreted the Drawings of the site and optimized the space to increase the floor space by 40%, ensuring efficient space and great visualization
• Supervised and improvised the manufacturing of machines by applying 6s and Lean manufacturing techniques and reduced the project cost by over $2000
ARAI-June 2015-Dec 2015
•Designed coolant Pump for 300cc 2 Cylinder I.C. engine at Automotive Research Association of India
• Designed pump using GT Power and SolidWorks, increased the efficiency of the pump from 65% to 72%
-
Projects
Time Series Analysis and Forecasting – Demand Forecasting of Tractor Sales using Time Series December 2019
• Forecasted the demand for tractor sales using ARMA modelling techniques and removed 8% error
• Evaluated the 6 ARMA models and suggested the appropriate model for the company
Discrete Event and Computer Simulation – Tugger Route Simulation at Wacker and Neuson December 2019
• Based on the Dimension given simulated the Tugger route in the company using ARENA simulation
• Optimized the route by 15% and gave the number of Tuggers required for inventory control
Senior Design Project – Design of Engine Coolant Pump for 4 Cylinder I.C. Engine June 2015-May 2016
• Designed coolant Pump for research I.C. engine at Automotive Research Association of India
• Designed pump using GT Power and SolidWorks, increased the efficiency of the pump from 65% to 72%
SAE Baja or All-Terrain Vehicle May 2014-May 2016
• Guided the 2016 Team to AIR 7th in the virtual round and mentored for exact Manufacturing of the buggy
• Directed the roll cage department in the year 2015 and bought down the weight of the vehicle from 264 to 173 kilograms