I am Industrial and Systems Engineering graduate from San Jose State University with a experience of 4+ years in the field of Supply Chain, Procurement and Operations. I am looking to fill position in a dynamic team, who are willing to learn by execution and grow as a team player.
-
Experience
Student Assistant, Compass Group, San Jose, CA February 2018 - September 2019
• Delivered streamlined customer service to over 250 students and staff daily and ensured customer satisfaction
• Placed purchase orders for business unit by coordinating with vendor depending upon the demand and supply of the units
• Managed physical inventories while labeling and counting items and placed purchase orders about deficit in inventory
• Tracked inventory sales data and created sales report; tracked inventory budgets; analysis on a daily basis
Process Executive, Infosys BPM, Pune, India December 2016 - September 2017
• Lodged 100 plus purchase orders, RFQ and Purchase Requisition for business customers satisfying daily KPIs via ERP system
• Improved on time delivery to customer by 29% leading to elevated B2B customer satisfaction in supply chain
• Utilized Salesforce for customer accounts automation updates, account management, sales reporting and troubleshooting
• Continuously optimizing the business process by mapping BOM structure for better delivery of the project
• Examined and modeled employee performance data files and conducted several KPIs and benchmark to enhance logistics service, resulting in 100% customer retention
Production Process Engineering Intern, MSPGCL, Bhusawal, India May 2014 – May 2016
• Gained experience in forecasting, MRP, BOM techniques for production planning of electricity for Maharashtra State
• Supervised day to day operations of the manufacturing plant for the coal handling business unit
• Drafted the plant layout using AutoCAD 2D to better utilize land resources around coal handling unit
• Assisted in supervising boiler maintenance and communicating with all level of employees
• Initiated Kaizen events to continuously improve the efficiency of boiler; reducing the level of impurity in coal at handling unit
-
Projects
ACADEMIC PROJECTS
Financial and Environmental Impacts of EV on Last Mile Delivery
Tools: Tableau, IP, LINGO, BOM. August 2019 – December 2019
• Designed supply chain network using VRP visualization tool from Github repository based on forecasted demand
• Formulated heuristic algorithm for locating warehouse facility using mixed integer programming
• Conducted Financial cost analysis on model of supply chain integration to evaluate CO2e from IC engines and EV’s
• Practiced visualization to analyze the financial impact on last mile delivery problem in supply chain through Tableau
• Implementation of Electric Vehicle is beneficial by 48 % and breakeven point of approximately 2 years
Quality Assurance for a Manufacturing Facility
Tools Used: R, SPC, SQL, R Markdown, Cpk August 2018 - December 2018
• Assessed process variability on current process for manufacturing facility
• Collected various manufacturing time series data from database using SQL queries
• Utilized statistical process control methods, process capability to check control measures and took corrective actions
Operations Planning and Control
Tools Used: Forecasting, MPS, MRP, Excel, VBA, ProModel, Tableau January 2018 - May 2018
• Designed and planned forecast for demand, capacity planning using Bill of Material (BOM), MRP and scheduling
• Reviewed data and simulated system for scheduling of resources using ProModel simulation modelling
• Potential saving of $50,000 by reducing total number of machines required, and cycle time by 10 hours per week
Six Sigma Implementation Project
Tools used: Six Sigma, DMAIC, SIPOC, Statistical Analysis, VSM January 2018 - March 2018
• Identified major issues affecting the service time and waste management executing root cause analysis, fishbone diagram
• Performed analysis on the identified problems with Value Stream Mapping, SIPOC, Voice of Customer (VOC), Critical to Quality (CTQ), Plan-Do-Check-Act, Ishikawa diagram and hypothesis testing
• Developed a pareto chart for frequency measurement and improved process by 18%
Design & Manufacturing of Flat lapping Machine
Tools used: AutoCAD, MSD, GD & T, CATIA V5, BOM May 2015 - May 2016
• Designed the model for lapping machine, which will surface finish measuring pins in dimension of 2mm - 5mm
• Supervised the manufacturing of parts which were casted and molded in a foundry and coordinating procurement process
• Achieved the surface finish with tolerance of 3 - 5 microns and reduced the manufacturing cost of measuring pins by 60%